Snagging · sample report

Snagging report sample

A full report on a sample 4-bedroom villa: 146 defects, 11 of them critical, each pinned to the plan with a measurement and a priority. Below, what every page shows and how the developer works from it.

Sample report. The property and the defects are illustrative.

Four pages, one working document

The report is built for the developer’s handover team: they find each defect by its number on the plan and close it item by item.

  1. Pages of a sample snagging report, 1 / 4
    01

    Cover: the answer first

    The total and the split by priority on the first page: 146 defects, 11 critical, 38 major, 97 cosmetic. The date, the team and the handover appointment sit next to it.

  2. Pages of a sample snagging report, 2 / 4
    02

    Summary: where the defects are

    Defects by zone (most in Living and bedrooms: 37, Bathrooms: 31), the instruments used and what happens next, with the dates of the repairs and the recheck.

  3. Pages of a sample snagging report, 3 / 4
    03

    Floor plan with pins

    Every critical and major defect is a numbered pin on the floor plan, in the colour of its priority. The developer’s team walks straight to it.

  4. Pages of a sample snagging report, 4 / 4
    04

    Defect list with measurements

    10 critical and major items in a table: zone, what is wrong and the measured value — a slope, a moisture reading, a gap in millimetres. A reading makes the defect impossible to dispute.

Three priorities

Critical — fix before you sign (8% of the list in the sample). Major — fix within the defect liability period. Cosmetic — finish and appearance, best fixed before the furniture arrives.

Critical
11Fix before you sign
Major
38Fix within the defect period
Cosmetic
97Finish and appearance

What the measurements look like

Five critical items of the sample, as the report writes them.

  1. 1
    Water stands by the shower drain: floor slopes away from itBath
    slope 0.4% where 1.5% is needed
  2. 2
    Leak at the sink waste connectionKitchen
    moisture 38% in the cabinet base
  3. 3
    Cold air escapes at the AC duct joint above the ceilingLiving
    thermal delta 7.8 °C
  4. 4
    Water runs towards the sliding door, not to the gullyTerrace
    reverse slope 0.6%
  5. 5
    Socket on the east wall has no earthMajlis
    tester: earth open

After the repairs: the final report

The follow-up visit goes through the same list. Closed items are marked, anything still open goes back to the developer with the same number — the final report shows what is left before you sign.

  1. 01Today

    The report goes to you and, with your consent, to the developer.

  2. 021–3 weeks

    The developer fixes the items. Critical ones come first.

  3. 03Follow-up visit

    We recheck every item from this list, included in the price.

  4. 04Final report

    Closed items are marked; anything still open goes back to the developer.

What a real report adds

The sample shows the layout. The report on your home also has:

  • A photo of every defect, wide and close-up
  • Your floor plan, not a model one
  • Your property and unit on every page
  • English or Arabic, ready to forward to the developer

The same sample in Русский · العربية

Questions about the report

01

Is the sample a real property?

No. The villa and the defects are illustrative, and every page of the PDF says so. The layout, the priorities and the kind of measurements are the ones of a real report.

02

How soon do I get my report?

Within 24–48 hours of the inspection, as a PDF by email and WhatsApp.

03

In which language is the report?

English or Arabic, ready to forward to the developer. The sample is also in Russian, so you can read it yourself.

04

Can I forward the report to the developer?

Yes, it is made for that. With your consent we send it to the developer’s handover team ourselves.

05

What if the developer disagrees with an item?

Each item has a location and a measurement, so it is checked on site against the reading, not argued about.

Your own question?

Write it here. It goes to our snagging team in WhatsApp, and they answer there.

Your own question? Ask in WhatsApp

Book an inspection

Leave a number and the handover date. We will confirm the price and the slot the same day.

Phone or WhatsApp

Get a consultation

We reply on WhatsApp within a working day.