Is the sample a real property?
No. The villa and the defects are illustrative, and every page of the PDF says so. The layout, the priorities and the kind of measurements are the ones of a real report.
A full report on a sample 4-bedroom villa: 146 defects, 11 of them critical, each pinned to the plan with a measurement and a priority. Below, what every page shows and how the developer works from it.
Sample report. The property and the defects are illustrative.
The report is built for the developer’s handover team: they find each defect by its number on the plan and close it item by item.

The total and the split by priority on the first page: 146 defects, 11 critical, 38 major, 97 cosmetic. The date, the team and the handover appointment sit next to it.

Defects by zone (most in Living and bedrooms: 37, Bathrooms: 31), the instruments used and what happens next, with the dates of the repairs and the recheck.

Every critical and major defect is a numbered pin on the floor plan, in the colour of its priority. The developer’s team walks straight to it.

10 critical and major items in a table: zone, what is wrong and the measured value — a slope, a moisture reading, a gap in millimetres. A reading makes the defect impossible to dispute.
Critical — fix before you sign (8% of the list in the sample). Major — fix within the defect liability period. Cosmetic — finish and appearance, best fixed before the furniture arrives.
Five critical items of the sample, as the report writes them.
The follow-up visit goes through the same list. Closed items are marked, anything still open goes back to the developer with the same number — the final report shows what is left before you sign.
The report goes to you and, with your consent, to the developer.
The developer fixes the items. Critical ones come first.
We recheck every item from this list, included in the price.
Closed items are marked; anything still open goes back to the developer.
No. The villa and the defects are illustrative, and every page of the PDF says so. The layout, the priorities and the kind of measurements are the ones of a real report.
Within 24–48 hours of the inspection, as a PDF by email and WhatsApp.
English or Arabic, ready to forward to the developer. The sample is also in Russian, so you can read it yourself.
Yes, it is made for that. With your consent we send it to the developer’s handover team ourselves.
Each item has a location and a measurement, so it is checked on site against the reading, not argued about.
Leave a number and the handover date. We will confirm the price and the slot the same day.