Snagging checklist for a new home in Dubai

54 checks in 6 zones, from the kitchen to the pool: what to test, how, and what a defect looks like. Open it on your phone at the handover or print the PDF. Free, no sign-up.

PDF · Snagging checklist

Before you start

Ask the developer to have electricity and water on and the home empty: furniture hides defects. Bring six things.

Phone

Camera with flash, and a torch for side light on the walls.

Socket tester

A plug-in tester for live, earth and polarity.

Level and tape

A spirit level or a level app, and a tape measure.

Masking tape

Mark each defect on site, so the developer’s team finds it.

Floor plan and specification

From your sale agreement: what finishes and appliances were promised.

A jug of water

For the slope test in showers and on terraces.

The checklist

54 checks. Zones 1–4 apply to every home; a townhouse or a villa adds the outside, the garden and the pool.

PDF

01Kitchen9

  • Cabinet doors and drawersOpen each one fully: gaps even, soft-close works, nothing rubs.
  • Hinges and handlesTight, no screws missing, doors hang level.
  • Worktop jointsNo open seams; silicone runs unbroken along the wall and round the sink.
  • Sink and tapRun hot and cold for two minutes, then wipe under the sink with a dry tissue.
  • Sink drainageFill the bowl and let it go: no gurgling, no water backing up.
  • Hob, oven and hoodSwitch on every zone and the oven; the hood pulls air.
  • Supplied appliancesFridge, dishwasher, washing machine run; water connections stay dry.
  • BacksplashNo chipped tiles, grout full, sockets fixed straight.
  • LightsEvery ceiling light and under-cabinet strip works.

02Bathrooms9

  • Floor slopePour a jug of water: it runs to the drain, not to the door.
  • Shower screen and trayRun the shower for five minutes: no water outside the screen.
  • Water pressure and hot waterEvery tap and shower, hot and cold.
  • WCFlushes, refills and stops; seat and pan do not move.
  • Under the basinDry after running water; the trap is tight.
  • Grout and siliconeComplete round the bath, tray, basin and WC.
  • Hollow tilesTap with a coin on floor and walls: a hollow sound means poor bedding.
  • Extractor fanRuns and holds a sheet of paper against the grille.
  • Mirrors and accessoriesFixed firmly, no cracks or scratches.

03Rooms9

  • Walls and ceilingsShine a phone torch along the surface: patches, cracks and uneven paint show up.
  • FloorsChips, scratches, uneven edges between tiles, hollow tiles.
  • SkirtingFixed, joints closed, finished at the corners.
  • Internal doorsOpen and close freely, gaps even, every lock has a key.
  • Windows and sliding doorsOpen, close and lock; seals unbroken; no daylight through a closed frame.
  • WardrobesDoors aligned, rails and shelves fixed.
  • Balcony thresholdWater on the balcony runs away from the door.
  • Ceiling access panelsOpen and close; nothing loose above.
  • Sockets and switchesFixed straight, covers not cracked.

04Engineering10

  • Every socketA plug-in tester shows live, earth and correct polarity.
  • SwitchesEach one controls the light it should.
  • Distribution boardCircuits labelled; the test button trips the RCD.
  • AC in each roomCools noticeably, the thermostat responds, no drips from the unit.
  • AC ceilingsNo water marks under the units and ducts.
  • Water heaterHeats; the relief pipe runs to a drain.
  • Smoke detectorsIn every room shown on the plan; ask how the system is tested.
  • Intercom and door entryCalls through to the home and opens the door.
  • TV and data pointsWhere the plan shows them, faceplates fixed.
  • MetersNote the DEWA meter readings on the handover day.

05Outside: balcony, terrace, facade9

  • Terrace and balcony drainagePour water: it reaches the gully, no standing water.
  • Railings and balustradesNo movement when pushed, glass panels fixed.
  • RoofWhere you can reach it: membrane intact, drains clear.
  • Facade and sealantNo cracks; sealant unbroken round windows and doors.
  • Main entrance doorCloses and locks, weather seal intact.
  • Stone sills and copingsFixed and sloping away from the wall.
  • Driveway and pavingLevel, no sunken or rocking pavers.
  • ManholesCovers lift and sit level with the paving.
  • External lights and socketsWork; covers are weatherproof.

06Garden and pool8

  • Pool tilesNo cracked or hollow tiles, grout full.
  • Pool lightsEvery light works.
  • Pump and filtrationRuns without noise; the plant room is dry.
  • Water levelAsk whether the level holds overnight: a drop means a leak.
  • Overflow and drainsChannel and drains clear.
  • IrrigationEvery zone runs; no wet patches on walls.
  • Garden levelsGround slopes away from the house.
  • Outdoor taps and showerWork, no leaks at the wall.

How to hand the list to the developer

A defect the developer can find and understand gets fixed. Four steps make the list work.

  1. 01Photograph

    A wide shot to show where, a close-up to show what.

  2. 02Number and place

    Room, wall or fixture, and the same number on the masking tape.

  3. 03Send in writing

    Email the list to the developer’s handover team and keep the reference.

  4. 04Agree the recheck

    Ask for a date for the repairs and check every item again before you sign.

Don’t want to check it yourself?

Much of what goes wrong is invisible on the day: cold air escaping from AC ducts, damp behind tiles, a socket without earth. Two engineers find it with a thermal camera, a moisture meter and a laser level, and hand you a report the developer works from.

Inspection with a recheckfrom AED 1,500Book an inspectionAll prices

Questions about the checklist

01

Can I do the snagging myself?

Yes, this list catches what you can see and test by hand. What it cannot catch is hidden: AC ducts losing air above the ceiling, damp behind finished walls, hollow tiles under a large floor. That takes instruments.

02

Is the list the same for an apartment and a villa?

Zones 1–4 apply to every home. A townhouse or a villa adds the outside, the roof, the garden and the pool: 17 more checks.

03

When do I use the checklist?

Twice: at the handover appointment, before you sign the handover documents, and again at the recheck once the developer has done the repairs. Tick each item the second time.

04

Can I send the developer my own list?

Yes. Number each item, add a photo and the room, and send it in writing to the handover team. A list the developer can find item by item gets fixed faster.

05

Is the PDF free?

Yes. No sign-up and no email: open it, print it, share it. It is in English, Russian and Arabic.

Your own question?

Write it here. It goes to our snagging team in WhatsApp, and they answer there.

Your own question? Ask in WhatsApp

Book an inspection

Leave a number and the handover date. We will confirm the price and the slot the same day.

Phone or WhatsApp

Get a consultation

We reply on WhatsApp within a working day.