Does the developer accept the report?
Yes. It is made in the format developers work with in the UAE: location, photo, priority. With your consent we send it to the developer’s handover team ourselves.
Two engineers with a laser level, a thermal camera and a moisture meter go through the property room by room. Within 24–48 hours you have a PDF report the developer works from, and after the repairs we come back to check.
You send three details; everything else is on us. If you are abroad, we do it with your power of attorney or the developer’s access.
Property type, bedrooms and the handover date. A form or WhatsApp.
Fixed price and an inspection slot that fits the developer’s timeline.
Two engineers with instruments. Every defect is photographed and pinned to the plan.
A PDF with photos, measurements and priorities: for you and for the developer.
We check that every item is fixed and issue the final report.
One price covers the inspection, the report and one follow-up visit.
AED 1.00 per sq ft, down to AED 0.75 above 15,000 sq ft
Choose the property: the price updates straight away.
A majlis with its own bathroom adds AED 500 to a villa. One visit without the recheck is 20% less. Whole buildings and commercial premises are priced on request. Prices as of November 2026, confirmed when you book.
Book at this priceA real day of work: two engineers, a case of instruments and every room of the house. Tap a photo to look closer.
Arrival: two engineers and a case of instruments
Thermal camera on the AC grille: is cold air escaping
Raking light along the wall shows every flaw in the paint
Moisture meter by the shower drain
Water test: does the terrace drain to the gully
Tap test: a hollow tile sounds different
Each defect gets a marker on site and a pin on the planMuch of what goes wrong in a new home is invisible to the eye on the day of the handover. That is what the instruments are for.
Floors, walls and frames out of level: what later shows as a door that does not close or water that does not drain.
Air escaping from AC ducts, gaps in insulation, leaks behind finished walls.
Damp in wet areas, around showers and on the roof, before it becomes mould.
Polarity and earthing of every socket, so nothing is left to chance.
Not a list of complaints but a working document: the developer’s team takes it and fixes item by item.
The same list for every property; a villa adds the roof, the garden and the pool.
Not because the developer is bad: a new home has simply not been lived in yet. These come up in almost every inspection.
Shower floors and terraces sloping away from the drain, leaks under sinks.
Ducts losing cold air above the ceiling, thermostats out of calibration.
Hollow tiles that crack within a year, uneven grout lines.
Frames out of plumb, seals that let in dust and heat.
Sockets without earth, wrong labels in the distribution board.
Paint, scratches and chips that are easier to fix before the furniture arrives.
You typically have around 30 days after the completion notice.
The developer invites you to take over.
Inspection and report. The list goes to the developer.
Critical items fixed, we confirm it.
Remaining instalments, service charges, DEWA deposit.
Handover and title deed in your name.
Snagging is not mandatory, but critical defects are best fixed before you sign. After handover the developer’s liability remains: under Dubai law, generally one year for fittings and ten years for the structure.
Yes. It is made in the format developers work with in the UAE: location, photo, priority. With your consent we send it to the developer’s handover team ourselves.
Yes. We need access through the developer or a power of attorney. You get the report by email and WhatsApp and we can go through it on a call.
A few hours: an apartment takes less, a large villa with a pool takes most of the day. We agree the slot in advance.
After the developer’s repairs we go through every item in the report again and issue a final report. One recheck is included in the price.
Yes. New homes are where the list tends to be longest, because nobody has lived there and tested anything yet.
No. Within the defect liability period the developer still fixes defects. A report helps you claim them.
Electricity and water connected, and access from the developer or the keys. The property should be empty: furniture hides defects.
Yes. Resale, move-in and move-out inspections follow the same checklist; the report records the condition on the day of the visit.
Leave a number and the handover date. We will confirm the price and the slot the same day.