The WOW Tower
by Mr. Eight Development · Dubailand, Dubai
Apartments from 35 m²
Overview
The WOW Tower, developed by Mr. Eight Development, is marketed as a high-rise residential development in Dubai Land Residence Complex (DLRC), Dubailand. The project brings MR. EIGHT Branded Residences to a region dominated by mid-to-high-rise residential buildings and budget-friendly housing. In DLRC, where usability and connectivity are key drivers, The WOW Tower seeks to offer a branded positioning alongside a conventional apartment-based product offering.
Read the full overview 9 parts · 4 min read
02The concept
Mr. Eight Development markets The WOW Tower as a vertical residential address, not a mixed-use development. The project revolves around apartment living with a branded twist, appealing to residents seeking efficient apartment designs, controlled shared facilities, and structured payment plans in Dubai Land Residence Complex. In DLRC, the project’s branded positioning takes a backseat to price and connectivity considerations; in this project, the branded positioning is a unique selling point in a competitive apartment offering.
03The apartments
The WOW Tower in Dubai Land Residence Complex offers studios, 1-bedroom, and 2-bedroom apartments, with apartments referenced from floor 17 to floor 38. The apartments are priced starting from 709 000 AED (191 400 $) for studios, 1 084 000 AED (292 700 $) for 1-bedroom apartments, and 1 883 000 AED (508 400 $) for 2-bedroom apartments. The studios measure 380 to 510 sqft (35.3-47.4 m²). The 1-bedroom apartments measure 670 to 840 sqft (62.2-78.0 m²). The 2-bedroom apartments measure 1,220 to 1,460 sqft (113.3-135.6 m²). The project is set to complete in Q3 2029.
04Prices and payment
The payment terms for The WOW Tower by Mr. Eight Development are based on a 50/50 payment scheme with a booking fee of AED 70,000 (approximately USD 18,900). The annual service charges are set at AED 18 per sq. ft. for internal apartment space and AED 4.5 per sq. ft. for balcony or terrace space. In Dubai Land Residence Complex, where service charges differ from one building to another, standardized service charges create a more stable cost structure for both end-users and investors.
05Amenities
The facilities plan for The WOW Tower in DLRC is organized around wellness, recreation, and family-oriented facilities. The tower provides a swimming pool, a gymnasium, and padel courts, strategically located to facilitate frequent use for physical exercise. The landscaped areas and green spaces add functional outdoor space to the tower environment. Play areas for children are provided to address family-oriented use, consistent with the tenant demographic typically found in Dubai Land Residence Complex.
In a car-centric neighborhood like Dubailand, the provision of facilities on-site diminishes the need for frequent off-site excursions for exercise and recreation, which is important for time management during weekdays.
06Location
Dubai Land Residence Complex is a residential neighborhood within Dubailand, demarcated by apartment stock, road connectivity, and proximity to education and employment centers. The WOW Tower is accessible through connectivity to Al Ain-Dubai Road (E66), Emirates Road (E611), and Sheikh Mohammed bin Zayed Road (E311), further extending connectivity to Sheikh Zayed Road (E11) and Al Khail Road (E44). In effect, the residents of DLRC are connected to these highways for two-way commuting to and from Dubai’s central business districts, coastal areas, and outer employment nodes.
07The community
Neighboring areas like Dubai Silicon Oasis and Academic City add to the leasing strength of developments such as The WOW Tower by Mr. Eight Development. These areas serve as a draw for business professionals, academics, and families associated with educational institutions. The retail dynamics of DLRC usually involve a mix of neighborhood supermarkets and community facilities with larger shopping and entertainment hubs in Dubailand.
The region is generally chosen by families valuing ease of access, comparative affordability, and functional layouts more than proximity to the waterfront or nightlife density.
08Getting around
Driving times from Dubai Land Residence Complex reflect highway-based movement patterns. Downtown Dubai, Dubai Mall, and Burj Khalifa are typically reachable in approximately 25–35 minutes by car. Dubai Marina and JBR are generally within 30–45 minutes. Palm Jumeirah and Atlantis are approximately 35–50 minutes away. DXB Airport is usually 25–40 minutes, while Al Maktoum International Airport (DWC) is around 40–60 minutes. Actual travel duration depends on route selection and peak-hour traffic; residents in DLRC typically plan with buffer time during school runs and weekend retail peaks.
09As an investment
In terms of end-users, The WOW Tower in Dubailand provides compact to mid-scale units appropriate for single individuals, couples, and small families. The availability of in-house wellness and recreational facilities enables the support of a self-contained residential lifestyle.
In terms of investors, the studio to 2-bedroom configuration expands the target market, especially for Dubai Silicon Oasis, Academic City, and the overall Dubailand employment market residents. The completion period of Q3 2029 is appropriate for medium- to long-term strategic buyers. Specified service charges and a 50/50 payment structure enable quantifiable inputs for underwriting in Dubai Land Residence Complex.
The WOW Tower by Mr. Eight Development can thus be viewed as a branded high-rise apartment residential development in DLRC, integrating structured pricing, specified service charges, and a standard but comprehensive amenity package. In the Dubai Land Residence Complex and Dubailand context, the development is consistent with market trends revolving around road connectivity, apartment living, and cost-conscious decision-making.
Gallery


The WOW Tower by Mr. Eight Development
- Renderings and photos
- Floor plans and sizes
- Prices from AED 709,000
- Payment plan 50 / 50
Floor plans & prices
Payment plan
50% during construction and 50% upon handover
Amounts for the entry price of the home you choose. The handover payment can be financed with a mortgage
Amenities & service
Location
FAQ
Where is The WOW Tower real estate located?
Property at The WOW Tower is in Dubai Land Residence Complex (DLRC), within Dubailand, Dubai, UAE.
What property types are available at The WOW Tower by Mr. Eight Development?
The WOW Tower offers apartments: studios, 1-bedroom, and 2-bedroom units.
What bedroom options do The WOW Tower apartments include?
Apartments for sale at The WOW Tower include studio, 1-bedroom, and 2-bedroom types.
How much does property in The WOW Tower cost?
Starting prices of property in The WOW Tower are the following: studio from 709 000 AED (191 400 $), 1-bedroom units from 1 084 000 AED (292 700 $), 2-bedroom units from 1 883 000 AED (508 400 $).
What are The WOW Tower payment plan terms for buyers?
The stated plan is an investment plan 50/50, with booking at 70 000 AED (18 900 $). Further schedule details are not disclosed.
When is the handover of The WOW Tower by Mr. Eight Development?
Handover of The WOW Tower by Mr. Eight Development is planned for Q3 2029.
New projects in Dubailand
The WOW Tower by Mr. Eight Development starts from AED 1,548 per ft². The 69 new projects of Dubailand on our site range from AED 827 to AED 2,570 per ft².
| Project | From, per ft² | From | Handover | Plan |
|---|---|---|---|---|
| Heaven Views4Direction Developers | AED 1,847 | AED 656,000 | Q1 2026 | 30 / 70 |
| Maravelle ResidencesMajid Al Futtaim | AED 1,830 | AED 5,190,000 | Q2 2029 | 10 / 50 / 40 |
| Capria at Ghaf WoodsMajid Al Futtaim | AED 1,810 | AED 1,500,000 | Q4 2028 | 10 / 50 / 40 |
| Ghaf WoodsMajid Al Futtaim | AED 1,742 | AED 1,200,000 | Q4 2027 | 10 / 50 / 40 |
| Meraas The AcresMeraas | AED 1,660 | AED 10,400,000 | Q4 2027 | |
| Distrikt at Ghaf WoodsMajid Al Futtaim | AED 1,639 | AED 1,470,000 | Q3 2029 | 10 / 50 / 40 |
| The WOW TowerMr. Eight Development | AED 1,548 | AED 709,000 | Q3 2029 | 50 / 50 |
More new projects at a similar price
| Project | From, per ft² | From | Handover | Plan |
|---|---|---|---|---|
| Sobha ElwoodSobha Realty | AED 1,598 | AED 7,932,000 | Q4 2027 | 20 / 40 / 40 |
| Aldar The WildsAldar | AED 1,597 | AED 5,100,000 | Q2 2029 | 10 / 55 / 35 |
| Empire GardensEmpire Developments | AED 1,579 | AED 700,000 | Q3 2028 | 20 / 35 / 1 / 44 |
| Azizi Milan HeightsAzizi | AED 1,548 | AED 580,000 | Q2 2028 | 10 / 50 / 40 |
| Ellington Belgrave GardensEllington | AED 1,517 | AED 1,200,000 | Q3 2028 | 20 / 50 / 30 |
| Sakura GardensHRE Development | AED 1,473 | AED 897,750 | Q2 2029 | 10 / 45 / 10 / 35 |
| Peace LagoonsPeace Homes | AED 1,473 | AED 769,900 | Q2 2027 | 20 / 80 |
| The ArchiveImtiaz Developments | AED 1,447 | AED 666,000 | Q3 2028 | 20 / 30 / 50 |
| VERDAN1A 5Object 1 | AED 1,439 | AED 702,121 | Q4 2027 | 20 / 40 / 10 / 30 |
| Samana IbizaSamana Developers | AED 1,435 | AED 695,000 | Q1 2028 | 20 / 57 / 23 |
| Reportage HillsReportage Properties | AED 1,402 | AED 2,625,000 | Q4 2028 | 20 / 10 / 70 |
| Izel by ZoyaZoya Developments | AED 1,389 | AED 681,000 | Q3 2028 | 10 / 40 / 10 / 40 |
| Celesto 2Tarrad Development | AED 1,363 | AED 530,000 | Q2 2028 | 10 / 40 / 50 |
| Reef 998Reef Luxury Developments | AED 1,358 | AED 695,900 | Q2 2028 | 20 / 50 / 30 |
| VERDAN1A 2Object 1 | AED 1,358 | AED 691,000 | Q2 2027 | 20 / 40 / 40 |
| California VillageGFH Real Estate | AED 1,351 | AED 4,150,000 | Q1 2026 | 15 / 25 / 60 |
| Imtiaz Cove Edition 5Imtiaz Developments | AED 1,349 | AED 675,000 | Q2 2027 | 20 / 30 / 50 |
| VERDAN1A 3Object 1 | AED 1,345 | AED 862,000 | Q3 2027 | 20 / 40 / 40 |
| Celesto TowerTarrad Development | AED 1,341 | AED 550,000 | Q4 2027 | 20 / 30 / 50 |
| Havencia by ALA DevelopmentsALA Developments | AED 1,316 | AED 650,000 | Q2 2028 | 20 / 30 / 50 |
| VERDAN1A 4Object 1 | AED 1,312 | AED 617,000 | Q2 2028 | 20 / 40 / 40 |
| Reef 1000Reef Luxury Developments | AED 1,302 | AED 620,000 | Q4 2026 | 20 / 40 / 40 |
| 09 Life ResidencesDeniz Properties | AED 1,299 | AED 675,000 | Q3 2027 | 20 / 40 / 10 / 30 |
Developer: Mr. Eight Development
7 projects on our site
Villa del GARDA by Mr. Eight Development
Villa del ARTE by Mr. Eight Development
Villa del BRUNELLO by Mr. Eight Development
Villa del GAVI by Mr. Eight Development


- Renderings and photos
- Floor plans and sizes
- Prices from AED 709,000
- Payment plan 50 / 50


