Brochure of Emaar Fior
Presentation in PDF: renderings, layouts, prices and payment plan. We will send the file to your WhatsApp in a few minutes.
- Price from AED 2,210,000
- Payment plan 10 / 70 / 20
- Handover Q3 2030
Download the PDF right after sending. A broker also sends it to your WhatsApp.


Look inside
Pages from the PDF. The whole file comes with the brochure.





In the PDF
All floor plansPDF · 28 pagesFloor plansOverview
Emaar's Fior is part of Rashid Yachts & Marina, a waterfront development that takes its lead from marina living and a promenade-style public realm. Fior is essentially a residential address that is peaceful and calm first, with the passage of time marked by the presence of berths, water, and the city skyline, and with leisure and retail woven into the fabric of the surroundings rather than segregated from them.
For buyers who are looking for Dubai connectivity without sacrificing their proximity to the coast, Emaar Fior finds itself wedged between the heritage city of Dubai and the newer areas of the city, providing a lifestyle that is rooted in the marina yet still connected to the city.
FAQ
Where is property at Emaar Fior located in Dubai?
Property at Emaar Fior is located in Rashid Yachts & Marina, Dubai, UAE.
What property types are offered in Emaar Fior?
Emaar Fior offers residential apartments in a waterfront marina community.
Which layouts are available in Emaar Fior apartments?
Apartments at Emaar Fior are available in 1-bedroom, 2-bedroom, and 3-bedroom options.
How much do Emaar Fior apartments cost to start?
Starting prices are: 1BR from 2 210 000 AED (596 700 $), 2BR from 3 160 000 AED (853 200 $), 3BR from 4 570 000 AED (1 233 900 $).
What is the size range of Emaar Fior apartments?
The stated size range is from 760 sqft (70.6 m²) up to 2,972.9 sqft (276.2 m²).
What are the payment plan terms for property at Emaar Fior?
An 80/20 construction-linked plan: 10% on booking; then 10% in April 2026, October 2026, April 2027, October 2027; 10% in May 2028 (30% completion), 10% in November 2028 (50%), 10% in June 2029 (80%); and 20% in July 2030 (100% completion).